AUSTRALIA

Giant installation at KAPSARC

Giant installation at KAPSARC

Completely tailor-made project with more than 6500m of lifelines, Walkways, platforms and stairs for variable slopes in a 5 different buildings.

Printable verison with more photos

Brief

A wide range of bespoke solutions and fixing assemblies are set up on KAPSARC Research Center. As specialist, we offer the complete solution, from site auditing and risk analysis to installation, commissioning and training.

Installed products

  • 12 complex rail tracks for courtyards access, up to 63º
  • 600m of Climbing SafeAccess
  • 100m of platforms and walkways
  • 300m of stairs
  • Over 1500 posts (fixed on standing seam roof) for lifelines, stairs and abseiling points

Geolocation

Giant installation at KAPSARC

Riyadh, Saudi Arabia